Direct Burial Loop Installation Guide
A quick-reference guide for direct burial loops used with vehicle detection systems.
Concrete: keep the loop above the rebar
- Position the loop above the rebar.
- Use straps as needed to maintain the loop’s shape.
- Aim for at least 3 inches of clearance between the loop and the finished concrete surface.
- Connect the loop to a detector and adjust the detector’s sensitivity to address interference between the loop and rebar.
Asphalt: protect the loop from heat
- Do not allow hot asphalt to contact the loop. Hot asphalt will damage it.
- Place the loop in the crusher run stone or sand layers, creating a buffer between the loop and the hot asphalt.
- Connect the loop to a loop detector.
Gravel: bury deeper and protect against sharp stones
- For an existing gravel road or driveway, create a trench for the loop.
- Bury the loop at least 6 inches below the surface to help protect it as the gravel wears down.
- Cover the loop with sand or fine-grain stone.
- Avoid direct contact with sharp or large gravel stones to help extend the loop’s life.
- Connect the loop to a detector.
Before you install
Choose the installation method for your surface and plan the required depth and protective material before placing the loop. Important installation notice: Test for continuity before installing